Relocation
Move a factory without losing a shift.
We relocate production lines, warehouse automation and heavy machinery across Europe. One contract covers engineering, permits, transport, installation and sign-off.
Survey & sequencing
Asset register, weights, utility maps and a move sequence built backwards from your restart date.
Disassembly
Controlled shutdown, mechanical and electrical isolation, tagging, crating and calibration records.
Heavy haulage
Abnormal load permits, escorts, air-ride and low-loader transport with GPS-tracked convoys.
Rigging & placement
Gantries, skates and jacking systems to place machines on new foundations to ±0.2 mm tolerance.
Recommissioning
Alignment, levelling, utility hook-up, dry runs and OEM-witnessed acceptance testing.
Handover
As-built documentation, spare parts reconciliation and a 30-day stabilisation support window.
Specialised equipment
Self-propelled modular transporters, 500-tonne gantries, air-bearing skates and climate-controlled crating.
Compliance built in
Lifting plans, method statements, CE and ATEX documentation, insurance and abnormal-load permits handled in-house.
Single point of contact
One project director owns the schedule from first survey to the moment your line runs at rate again.
Inbound corridors
Pick the lane your machines will travel.
Each corridor carries its own permit regime, escort requirement and customs procedure. We plan the move against the lane, not against an average.
Interactive corridor map
Ten live lanes into Hungary & Romania
Europe
Stuttgart → Budapest
Stuttgart, Bavaria and NRW plants relocated on low-loaders and air-ride trailers with single-permit routing through Austria.
- Mode
- Abnormal-load road convoy
- Transit
- 3–5 days
- Gateway
- Nickelsdorf
- Destination
- Hungary
- Volume
- 142 moves / yr
- Origin
- Germany
Deliverables
What lands on your desk.
Asset register
Every machine with weight, footprint, centre of gravity, utility draw and lifting points, exported as a live sheet.
Move schedule
Gantt built backwards from your restart date, with crew allocation, permit lead times and buffer-stock triggers.
Fixed-price scope
Phase-by-phase pricing for disassembly, transport, rigging, reinstallation and recommissioning, with named risk items.
As-built pack
Alignment reports, utility drawings, calibration certificates and acceptance sign-off from your engineering lead.
Have a shutdown window?
Tell us the dates and the heaviest asset on your floor. We'll come back with a phased plan and a fixed price.